C Turf Type Landscape Turf
-
Price:
Negotiable
- minimum:
- Total supply:
-
Delivery term:
The date of payment from buyers deliver within days
-
seat:
Beijing
-
Validity to:
Long-term effective
-
Last update:
2019-03-03 20:55
-
Browse the number:
402
Company Profile
By certification [File Integrity]
Contact:wanyuan(Ms.)
Email:
Telephone:
Area:Beijing
Address:No. 22 Wanyuan Bldg., Hongli West Road, Shenzhen, Guangdong, China (518028)
Website: http://wanyuan.kuangyuanmaoyi.com/
Product Details
Paving process



Supply Ability
Supply Ability:
30000 Square Meter/Square Meters per Day garden artificla grass turf
Name |
C TURF |
Type |
Tufted synthetic grass |
Material |
PE Monofilament straight & PP Monofilament curled (UV stabilised) |
Yarn Type |
9000 Dtex PE Monofilament Straight & PP monofilament curled |
Yarn Quality |
Environmmentaly friendly Free of Lead and cadmium |
Primary Backing |
100% PP black with fleece UV stabilised |
Secondary Backing |
Black Latex compound with SBRwith drainage holes |
Water Permeability |
60 litres/min/m2 |
Pile Height |
40mm |
Tuft Gauge |
3/8gauge |
Stitches per 10Cm Linear |
18 |
Stitches Per M2 |
18900 |
Colour |
Four Color |
UV stability |
meets DIN 53387 standard (6000 hours) |
Colour fastness |
Xenon test Blue scale >7 grey scale>4 |
Roll Width |
4meters |
Roll Length |
25 meters |
Application |
Gardens and landscaping |
Yarn SHAPE |
c |
Packaging & Delivery
Packaging Details
packed in rolls with PP bag.
Port : shanghai
Lead Time : 5-15days according to order quantity
Prepare and test the base ground: Inspect the foundation to ensure it has a flat and smooth surface and appropriate slopes, making sure the foundation is qualified for installing artificial grass.
Measuring line: Locate the centers of the ground and the two semicircles, and according to these three centers locate the intersecting point of half-way lines and touchlines, and then determine the positions of functional lines and spot by using Pythagorean proposition.
Palletising turf roll: According to drawing, position the turf rolls on the exact places along the touchline.
Cutting the edge: Cut white turf piece into strips(width to be as per actual need) for white functional lines(half-way lines, base lines etc.), and put them aside preparing for installation.
Cutting white line: Measure and re-position the white line on the turf that has been all well joined on the ground. Cut the turf out and place the seam tape beneath the cuts.
Infill rubber granules: After sand infilling, Place the rubber granules piles on the lawn on different spots evenly at a distance of 4m from each other, then spread them evenly on the lawn(the quantity of sand depends on the pile height of the turf). Afterwards, use the combing machine to sweep the sand into the fibers and to comb up the fibers. Do this process once longitudinally and transversely.
Brushing: to brush the grass in the vertical and horizontal one time by the grass-brushing machine
Check and Acceptance: Inspect the entire finished lawn as per concerned standards and requirement. If any defects found, correct it.
Acceptance: cooperate to check and accept
● 1.Lay turf onto base and position where needed. Using a carpet knife/razor knife, cut off the excess turf on the backside (3 stitches in from sides). Cut turf (on backside) to fit area.
● 2.Fasten one end with 40D or 60D Bright Common nails of 5-6 inches in length, spaced 3-4 inches apart along the edges. Stretch turf and fasten with nails as you move across to the opposite end. Place a nail every 12-24 inches throughout the center and every 3-4 inches along the perimeter
● 3.Fasten together seams by using 11 gauge 6"x1"x6" staples spaced 4 inches apart along the seam. Do not countersink staples.
Note: Be sure the seams are taut and precise, the grain of the turf is facing in the same direction, and the space at the seam is the same as the stitching gauge.
● 4.After turf is installed, power broom before applying infill. Apply infill onto turf using a drop spreader. Spread infill as evenly as possible with a grading rake or broom until infill settles into the base of the turf.
Note: Never use regular sand for infill.
● 5.Hand or power broom again so that the blades are standing straight up. Use carpet scissors to trim off the excessive turf blades. Clean the surrounding area with a blower or a broom.
http://www.windygrass.com/
- Apparel & Textile Manufacturing Equipment
- Electronics Manufacturing Equipment
- Environmental Equipment
- Hardware Industry Tooling & Services
- Industrial Machinery
- Industrial Measuring, Testing & Inspection Equipme
- Dimensional Measuring Instrument
- Distance Measuring Instrument
- Electrical Measuring Instrument
- Industrial Analyzers & Measuring Equipment
- Industrial Balance & Weighing Equipment
- Industrial Testing & Inspection Equipment
- Light Measuring Instrument
- Pressure Measuring Instrument
- Temperature & Humidity Instrument
- Water Quality & Fluid Measuring Instrument
- Weather Monitoring Instrument
- Industrial Printing & Packaging Supplies
- Industrial Safety & Law Enforcement Equipment
- Industrial Supplies
- Manufacturing Equipment
- Additive Manufacturing Machinery & Supply
- Food & Pharmaceutical Machinery
- Glass Processing Machinery
- Hardware & Building Material Machinery
- Industrial Automation Machinery
- Metallurgical & Metalworking Machinery
- Packaging Tools & Machinery
- Plastic & Foam Machinery
- Printing Machinery
- Production Line
- Pulp & Paper Machinery
- Rubber Processing Machinery
- Textile Machinery
- Material Handling & Construction Machinery
- Vending & Entertainment Machines


