Ductile Iron Casting, OEM/ODM Orders are Welcome, Various Types are Available
-
Price:
Negotiable
- minimum:
- Total supply:
-
Delivery term:
The date of payment from buyers deliver within days
-
seat:
Beijing
-
Validity to:
Long-term effective
-
Last update:
2017-09-29 23:07
-
Browse the number:
125
Company Profile
By certification [File Integrity]
Contact:casting(Mr.)
Email:
Telephone: (86 411) 39218333 Ext:8006
Area:Beijing
Address:No.73 Zhenpeng Industrial Park, Dalian Development Area, Dalian, Liaoning, China (116600)
Website: http://casting.kuangyuanmaoyi.com/
Product Details
Model Number: DZS-01339
Key Specifications/Special Features:
Types: gray iron, ductile iron, ADI and malleable iron castingOEM/ODM orders are welcomeFIMA, APQP, QA, QC, AQL and R/DDuctile iron casting:Molding process: resin/green sandMaterials: EN-GJS-400-15/EN-GJS-500-7/EN-GJS-600-3/EN-GJS-700-2Molding: hand molding/molding machine Z145/146/148/molding linePossible heat treatment: annealing
Industry involved: municipal industry/construction industry/fluid industry/automotive industry
Part unit weight range: 0.5 to 2,000kg
Maximum/minimum wall thickness requirement: 4 to 250mm
Grey iron casting:
Malleable casting:
- Molding process: green/resin sand
- Materials:
- EN-GJL-150/DIN 1691 GG-15
- EN-GJL-200/DIN 1691-GG20
- EN-GJL-250/DIN1691-GG25
- EN-GJL-300/DIN1691-GG30
- Molding: hand molding/molding machine Z145/146/148/molding line
- Industry involved: municipal industry/construction industry/fluid industry/automotive industry
- Part unit weight range: 0.5 to 2,000kg
- Maximum/minimum wall thickness requirement: 4mm
- Molding process: green sand
- Materials: ferrite malleable iron KTH350-10, KTH370-12 and KTZ2550-04
- Molding: hand molding/mechanical molding/molding machine/molding line
- Possible heat treatment: annealing, normalizing and quenching
- Industry involved: power transmission/construction industry
- Part unit weight range: 0.2 to 15kg
- Maximum/minimum wall thickness requirements: 4 to 10mm
- Representative product: insulator caps/fastener/scaffold
Shipping Information:
- FOB Port: Dalian
- Lead Time: 45 - 60 days
Main Export Markets:
- Asia
- Australasia
- Central/South America
- Eastern Europe
- Mid East/Africa
- North America
- Western Europe


